Gray Bridge in Horton in Ribblesdale will be closed to all traffic for a month from February 28th to March 25th 2022 for structural repairs.
In principal this means that if you are intending to use the YDNP Car Park you will have to approach Horton from the Settle end of the B6479 (Gauber Road) i.e. from the southern end.
The adjacent footbridge over the river is unaffected.
See https://www.cravenherald.co.uk/news/198 ... h-repairs/ or https://www.hortoninribblesdale.org.uk for confirmation.
Access to Ribblehead from the south will have to be made via Ingleton.
Horton Bridge Closure
Re: Horton Bridge Closure - Important Update
The closure has been postponed due to local concerns, see the following link
https://www.cravenherald.co.uk/news/199 ... residents/
https://www.cravenherald.co.uk/news/199 ... residents/